Structure of Power Sector
Installed generation capacity: |
8,355 MW |
|
of which |
Thermal: |
62 % |
|
Nuclear: |
0 % |
|
Hydro: |
34 % |
|
Fuel oil-fired, gas-fired and CHP plants |
4 % |
Structure of Electric Energy Generation and Transmission
The EPS Thermal Power Plants |
26,546 GWh |
The EPS Hydro Power Plants |
11,924 GWh |
Withdrawn from the neighbouring systems |
7,.926 GWh |
Injected into the neighbouring systems |
8,474 GWh |
Transmission losses on all voltage levels (400 / 110 kV) |
1,423GWh |
Substations and Hi-Voltage Trunks in Serbian electricity grid
Substations (total: 87) |
Hi-voltage Trunks |
||
Voltage level |
Installed capacity |
Line length |
Voltage level |
400 kV |
7 150 MVA |
1 538 km |
400 kV |
220 kV |
7 050 MVA |
2 151 km |
220 kV |
110 kV |
13 150 MVA |
5 720 km |
110 kV |
LATEST NEWS
- December 9, 2023 Serbia: Electricity cross border trading
- December 9, 2023 Serbia: The oil Pipeline with Hungary is strategically important
- December 8, 2023 Greece: Deme and Faria to develop offshore wind parks