EPS SHPPs project

, Uncategorized

 

Elektroprivreda Srbije (EPS) intends using the proceeds of a loan from the European Bank for Reconstruction and Development [the Bank] for a project to rehabilitate fifteen (15) small hydro power plants (SHPPs) in Serbia, with a combined capacity of 17,8 MW, together with the construction of eight (8) new small hydro power plants on existing dams, with a combined capacity of 14,7 MW (the Project). The proposed project, which has a total estimated cost of EUR 53.5 million equivalent, will require the procurement of the following goods, works and services: